Define maintenance requirements from day one

Introduction

Too often, operation and maintenance documentation is defined too late or handled on the fly. Without clear requirements from the beginning, the handover process becomes inconsistent, resulting in gaps in quality and structure. This challenge is amplified during project close-out, which is typically a busy and high-pressure phase where teams are already focused on moving to the next project.

As a quality manager, you can use Dalux Handover to define requirements in advance, establish clear expectations for subcontractors, and track each asset to guarantee that all necessary documentation is provided, verified, and complete prior to the handover.

The challenge

Projects often operate with weak, unclear, or completely missing requirements for documentation. Without defined standards early on, subcontractors are left guessing what needs to be delivered and in what format.

This lack of direction usually becomes apparent when submissions are reviewed and rejected late in the process, forcing subcontractors to perform reactive rework during the final stages before handover.

As a result, the project does not deliver structured, usable operation and maintenance data. Instead, the building owner or FM team is left with fragmented and inconsistent documentation that is difficult to navigate in and use in ongoing facility management.

How Dalux Handover solves it

Before the handover begins, the required information for each asset is defined, ensuring that all necessary data is clearly specified and agreed upon. Using templates from company standards or previous projects requirements can be reused and adapted instead of created from scratch.

Throughout the handover process, subcontractors provide and update asset information directly on the platform. Review workflows then ensure that the data meets the requirements of each work package by checking and approving it.

This creates a structured process from defining requirements to collecting and validating high-quality operation and maintenance data.

The result

With Dalux Handover you get:

  • Clear requirements from day one: Define asset information requirements upfront, so subcontractors know exactly what to deliver.
  • Issues identified early: Track progress throughout the project and identify missing or incomplete information weeks before handover.
  • Reliable operation and maintenance data at the handover: The building owner receives structured, verified asset information.

From requirements to a completed record

In Dalux, you create templates and define the required properties before subcontractors start registering assets. This ensures that assets cannot be registered without the necessary information.

Templates can be efficiently reused or imported from the company profiles, other projects or, Excel, and can easily be modified to suit the projects need.

Once templates are in place and requirements are agreed, each subcontractor receives a clearly defined set of asset cards to complete and submit for review. The entire process is managed within a single system, where feedback and changes are linked directly to each asset, making communication clear and traceable. 

You can monitor progress through a dashboard and step in early if anything begins to go off track.

At the project handover, the owner receives the same structured asset data that was entered, reviewed, and approved during the process.

A handover built on verified asset data

By defining requirements early and managing asset information throughout the project, the quality manager can ensure a smoother handover with complete, verified, and structured data. Instead of chasing missing documentation at the end, the owner or FM team receives reliable information that is ready to support efficient facility management from day one.

With Dalux Handover you get:

  • Clear requirements from day one: Define asset information requirements upfront, so subcontractors know exactly what to deliver.
  • Issues identified early: Track progress throughout the project and identify missing or incomplete information weeks before handover.
  • Reliable operation and maintenance data at the handover: The building owner receives structured, verified asset information.

Read more

If you want to get started with Dalux Handover, read these articles: Handover

Was this article helpful?

More resources

  • Dalux Academy

    Transform your professional development with our e-learning platform. Experience customized education designed to match your specific construction role

  • Webinars & sneak peeks

    We hold regular product sneak peeks and online training sessions for beginner and advanced users on various topics.

  • Videos

    Browse our video tutorials, release note videos, and more on Vimeo.

  • LinkedIn

    Follow us on LinkedIn